MERBAU CHONDONG
WATER SUPPLY PROJECT,
PHASE I EXTENSION
|
RM 30 million
(USD 8.0 million)
|
Air Kelantan Sdn. Bhd.
|
Kelantan
|
2006
-
present
|
This project is an extension of an earlier project and is aimed and further distribution of the water supply to the areas not covered in the earlier project.
A total of nearly 30.0km of pipeline varying in diameters from 200mm to 600mm, a elevated tank (2.3 Ml) and suction tank (1.5 Ml) together with reservoir (4.5 Ml) were constructed
|
MERBAU CHONDONG
WATER SUPPLY PROJECT, PHASE I
|
RM 65 million
(USD 17.2 million)
|
Air Kelantan Sdn. Bhd.
|
Kelantan
|
2002
-
2004
|
This project consist of water intake, water treatment plant, balancing reservoirs, terminal reservoirs and distribution pipes in the Machang District of Kelantan. Water supply is channelled to the Districts of Machang, Pasir Puteh and Kota Bharu (south).
A water intake and treatment plant of 40 Mld capacity was constructed
The total length of pipeline laid is 70.0km varying in diameters from 400mm to 800mm. A 4.5 Ml balancing reservoir and a 2.3 Ml terminal reservoir were constructed.
|
DUNGUN WATER SUPPLY PROJECT, PHASE II
|
RM 80 million
(USD 21 million)
|
Water Works
Dept.
Terengganu
State
|
Terengganu
|
1997
-
1999
|
This project consist of water intake, water treatment plant, balancing reservoirs and distribution pipes for the Bukit Bauk water supply system supplying water to Paka in the District of Dundun in Terengganu.
The existing intake and treatment plant units capacity upgraded from 32 Mld to 76 Mld. The total length of pipeline laid is 30.0km varying in diameters from 700 to 1000mm. A 4.5 Ml balancing reservoir and a 7.5 Ml terminal reservoir were constructed
|