Track Records >> Solid Waste Management

 

Project

Project Cost

Client

Location

Year

 

SANITARY LANDFILL AT LABUAN, WILAYAH PERSEKUTUAN LABUAN

 

 

 

 

 

 

 

 

N/A

 

 

 

 

 

 

 

 

 

 

Perbadanan Labuan

 

 

 

 

 

 

 

 

 

Labuan

 

 

 

 

 

 

 

 

 

 

2010

On-going

 

 

 

 

 

 

 

 

 

EEC provided consultancy services in the following :-

  •   Topographical study
  •   Geotechnical study
  •   Preliminary design
  •   Detailed Design
  •   Tender documentation/Tender call/ Tender assessment
  •   Construction supervision
  •   Defect and liability stage

SANITARY LANDFILL AT PAGOH, MUAR

 

 

 

 

 

 

 

 

N/A

 

 

 

 

 

 

 

 

 

Jabatan

Pengurusan Sisa Pepejal

Negara

 

 

 

 

 

 

Pagoh, Muar,

Johor

 

 

 

 

 

 

 

2008

-

( on going )

 

 

 

 

 

 

 

EEC provided consultancy services in the following :-

  • Topographical study
  • Geotechnical study
  • Preliminary design
  • Detailed Design
  • Tender documentation/Tender call/Tender assessment
  • Construction supervision
  • Defect and liability stage

MEDICAL WASTE INCINERATOR UPGRADING, KAMUNTING, TAIPING MALAYSIA

 

 

 

 

 

 

 

N/A

 

 

 

 

 

 

 

 

 

 

Faber-MediServe Sdn. Bhd.

 

 

 

 

 

 

 

 

Kamunting, Taiping, Perak

 

 

 

 

 

 

 

 

2006

-

2008

 

 

 

 

 

 

 

 

EEC provided consultancy services in the following :-

  • Environmental impact assessment
  • Waste characterisation study
  • Topographical study
  • Geotechnical study
  • Preliminary design
  • Tender documentation/Tender call/Tender assessment
  • Construction supervision
  • Post contract services

AIR POLLUTION CONTROL EQUIPMENT (APCE) INSTALLATION AT KAMUNTING, TAIPING & LOK KAWI, KOTA KINABALU, MALAYSIA

 

N/A

 

 

 

 

 

 

Faber-MediServe Sdn. Bhd.

 

 

 

 

Kamunting, & Lok Kawi

 

 

 

 

 

2005

-

2007

 

 

 

 

This project involves the provision of APCE equipment to medical/clinical incinerators at Kamunting, Taiping and Lok Kawi, Taiping.

 

The total cost of this project is RM8.0 million

 

EEC provided consultancy services for this project.

 

to view our full list of work scopes for all projects:

Airports

Environmental

Highways & Bridges

Ports

Structures

Urban

 

(C) 2015 Engineering and Environmental Sdn. Bhd. All Rights Reserved.