Track Records >> Roads, Highways and Bridges

 

Project

Project Cost

Client

Location

Year

 

MODERNISATION OF THE RAIL SERVICES FROM

TANJUNG ARU TO TENOM, SABAH

 

 

 

 

RM 300 million

(USD$ 83

million)

 

 

 

 

 

Ministry of Transport, Government of Malaysia

 

 

 

 

 

Sabah

 

 

 

 

 

 

 

 

2007

-

2012

 

 

 

 

 

 

Project comprises a short term improvement works for the  134 km rail line and 13 stations emphasising on the safety aspects, operational efficiency, rehabilitation and upgrading of the infrastructure facilities and procurement of rolling stock

 

EEC's scope of work  as the Project Management Consultant(PMC) services includes provision of technical advice and skills for the implementation,testing and commissioning and to ensure the required standards and quality are achieved within the time frame and cost

         

 

HI - SPEED RAIL KUALA LUMPUR TO  SINGAPORE (FEASIBILITY STUDY)

 

 

RM 98 billion

(US 30 billion)

 

 

 

 

Malaysia Land Transport Commission (SPAD)

 

Malaysia

 

 

 

 

 

2012

 

 

 

 

 

EEC participated in consortium with Roland Berger (German) and Arup International in the bid preparation and submission for a comprehensive Feasibility Study for the development of a Hi-Speed Dedicated Rail connection between Kuala Lumpur and Singapore.

 

         

 

SOUTH  KLANG  VALLEY  EXPRESSWAY

 

 

 

 

 

 

 

 

 

 

 

 

 

RM 1.1 billion

(USD$ 305 million)

 

 

 

 

 

 

 

 

 

 

 

 

 

SKVE

Holdings

Sdn Bhd

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2007

-

On going

(expected

completion

 by August

2013 )

 

 

 

 

 

 

 

 

 

The proposed privatised South Klang Valley Expressway (SKVE) commences from the existing cloverleaf interchange at UNITEN and terminates at Pulau Indah.

The total length of SKVE is approximately 53km.

Section 1B

Works provide for the construction of approximately 10.6 km of dual two lane carriageway and 1 trumpet interchange

Section 2

Works provide for the construction of approximately 7.5 km of dual three lanes carriageway and 2 trumpet interchanges

Section 3

Works provide for the construction of approximately 18.9 km of dual single lane carriageway and 2 trumpet interchanges

Scope of work

Comprises professional services as Independent Checking Engineer (ICE) for the Lenders ( Islamic Development Bank and Bank Pembangunan Malaysia Berhad )

         

 

KARACHI ELEVATED EXPRESSWAY PROJECT

 

 

 

 

 

 

 

 

 

 

 

 

 

(USD$ 270 million)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IJM Corporation Bhd and   City     District Government of Karachi( DGK)

 

 

 

 

 

 

 

 

 

Pakistan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Status : Investigation and Design Stage

Lead Engineering Consultant for the design of a 24.5 km dual  2-lane and dual 3-lane  elevated expressway Shara-e-Faisalf from Jinnah Bridge, Native Jetty to Quaidabad in the city of Karachi, Pakistan  The project includes 6 interchanges at various locations along the expressway, toll  plazas, bridges and all associated facilities and M and E works.

The project is being designed and constructed by IJM Corporation Berhad who will also operate and maintain the expressway under a form of BOT arrangement with the City District Government for 20 years.

The works for the expressway comprise widening and upgrading the existing dual 2 and dual 3 lane highway at grade and provision of an elevated roadway with appropriate connections at major road intersections

         

 

KUALA LUMPUR INTERNATIONAL AIRPORT 2 - ( LCCT )

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

USD114 million

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Malaysia Airport Holding Berhad.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sepang, Malaysia

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Commenced 2009 on going

(expected completed by end 2013)

 

 

 

 

 

 

 

 

 

 

 

 

 

The construction of the new Low Cost Carrier Terminal, or KLIA2, is being implemented by Malaysia Airport Holding Berhad (MAHB) to replace the temporary LCCT which has exceeded its capacity. EEC was appointed as the consulting engineers for the design and construction supervision of Aircraft Parking Apron under package name of TB02. The works covering an area of 105 Ha under  EEC's professional services are as follows :

  • 7.85 km of taxiways and taxilanes with a total pavement area of  51.1 Ha.
  • 0.8 km of airside service road
  • 58 nos of Code C aircraft apron and  18 nos of Code E and MARS apron with a total pavement area of 33.4 Ha.
  • 14km of Tertiary  drains
  • 1 km of Secondary drains
  • 10 Nos. of Oil water separators.
  • The Ground Support Equipment (GSE) road, baggage handling and  M&E tunnels and associated approach ramps linking  the Main Terminal Building and Satellite Building over a distance of 300m.
  • Construction Supervision

 