Track Records >> Infrastructure

 

Project

Project Cost

Client

Location

Year

 

AL-MOGRAN PROJECT - SUNUT FOREST & RESIDENTIAL AREA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Alsunut Development Company (ASDC)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sudan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2008

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The project area comprises the Sunut Forest and the Residential Area which lie about one kilometre south of the confluence point of the White and Blue Niles The site is to be reclaimed by the building of a river protection embankment of around 6 kilometers

 

The Sunut Forest site which is an existing Forest Reserve of Sunut trees occupying an area of approximately  420 Acres. It is proposed to be developed into an 18-hole Golf Course and a Public Reserve / Park.

 

Other developments include 100 acres for residential development, another  910 acres for residential development, featuring a variety of carefully planned neighbourhoods of luxurious villas, townhouses, and apartments, complete with supporting facilities.

 

EEC's  scope of work includes:

  • To review the requirements of the Urban Design Master Plan.

  • Provide specification Survey and Topographical investigations

  • To undertake both internal as well as external Traffic Study.

  • To undertake the study of all infrastructure services for the Sunut and South Sunut developments.

JAZAN ECONOMIC CITY

 

 

 

 

 

 

 

N/A

 

 

 

 

 

 

 

 

Biwater Malaysia

 

 

 

 

 

 

 

Saudi Arabia

 

 

 

 

 

 

 

 

2008

 

 

 

 

 

 

 

The project is dedicated to the pioneering of industrial development in Saudi Arabia. The project area comprises 1000 ha for Phase 1 and includes  development of heavy industries, lifestyle development, agro-industrial development and  residential.

 

EEC's  scope of work includes:

  • Civil and structural engineering design for the water and sewerage treatment plants

PROPOSED DANGA BAY DEVELOPMENT, A2 AND F2

 

 

 

 

 

 

 

 

RM120 million (USD 33 million) and RM150 million (USD 41 million) respectively

 

 

 

 

 

Kota Selatan Tebrau Sdn. Bhd.

 

 

 

 

 

 

 

 

Danga Bay

 

 

 

 

 

 

 

 

 

 

2008

 

 

 

 

 

 

 

 

 

 

The project comprises the integrated high end mixed development including  hotels, residential, commercial and  marina complex. The project includes 2 phases : Phase A2 (112 acres ) and F2 ( 120 acres).

 

EEC's scope of services includes:

  • Phase A2 includes infrastructure masterplanning, reclamation and shoreline protection on a design and build concept.
  • Phase F2 works includes dredging and reclamation and shoreline protection on a conventional design and build concept.

RESORT DEVELOPMENT AT KUALA TERENGGANU, MALAYSIA

 

 

N/A

 

 

 

 

 

Terengganu

 

 

 

 

 

 

2008

 

 

 

 

 

The project of 18 hectares is located on a beachfront facing the South China Sea of the State of Terengganu with a backdrop comprising natural forest and waterfalls.

 

The integrated resort will comoprise main Hotel, Restaurants, Hotel Suites, Club Lodge, Chalets, Spa and Recreational facilities

 

to view our full list of work scopes for all projects:

Airports

Environmental

Highways & Bridges

Ports

Structures

Urban

 

(C) Engineering and Environmental Sdn. Bhd. All Rights Reserved.