ProjectN
|
Project Cost
|
Client
|
Location
|
Year
|
|
NEW LAHAD DATU AIRPORT
|
RM 600 million
USD$ 200 million
|
Ministry of Transport, Malaysia
|
Lahad Datu Sabah, Malaysia
|
2011
-
2012
|
Engineering and Environmental Consultants Sdn. Bhd. (EEC) has been appointed to undertake the Feasibility Study to establish the feasibility of building a new airport at Silabukan to replace the existing Lahad Datu Airport. The Study covers Traffic Forecast, Topographical Survey, Airport and Airspace Planning, Geotechnical, Infrastructure, Utility and Drainage Engineering, Environmental, Economic, Financial and Management aspects.
The commencement of the Feasibility Study is in October 2011 and the completion is in June 2012.
|
KING ABDULLA AIRPORT, JAZAN, KINGDOM OF SAUDI ARABIA
|
SR 3.75 billion
USD$ 1 billion
|
General Authority of Civil Aviation (GACA) Kingdom of Saudi Arabia
|
Jazan City, Kingdom of Saudi Arabia
|
2010
-
2011
|
Engineering and Environmental Consultants Sdn Bhd (EEC) , together with a Saudi firm of architect ( Edge Arabia ) has been appointed to undertake the Master Planning and Detailed Engineering Designs for the project.
The commencement of the project is in June 2010 and the completion in November 2011.
|
LCC TERMINAL
|
RM 300 million
USD$ 100 million
|
Malaysia Airports Holdings
Sdn. Bhd.
(MAHB)
|
Sepang,
Malaysia
|
2009
-
2011
|
Engineering and Environmental Consultants Sdn Bhd (EEC) has been appointed to under take the work package TB02: Apron and high mast lighting package. This package is estimated to cost RM300 million and involves the design of all the aircraft stands, taxiways and taxilanes, high mast lighting, all services and utilities and visual aids associated with the apron.
The commencement of the project is in July 2009 and the completion in October 2011.
|
KHARTOUM NEW INTERNATIONAL AIRPORT
(PRIVATISATION BID)
|
Phase 1 : RM 2 billion
USD667 million
|
Malaysia Airports Management & Technical Services Sdn. Bhd.
|
Khartoum, Sudan
|
2009
|
The Khartoum New International Airport will be located on a greenfield site of 360 sq.km approximately 40km southwest of the city center.The airport for Phase 1 will be designed for 6.5 million annual passengers and 200,000 tons of cargo with a dual runway system, passenger and services terminals, commercial complex and a residential area for a 1,000 population.
EEC supported the Client in a privatisation bid
Scope of work covered all civil, structural and M & E engineering design services
|
UPGRADING WORKS TO ACCOMMODATE THE AIRCRAFT AIRBUS A380
OPERATIONS AT KUALA LUMPUR INTERNATIONAL AIRPORT
|
RM 100 million
USD$ 26 million
|
Kuala Lumpur International Airport Bhd.
|
Sepang, Malaysia
|
Mac 2005 ¨C
2008
|
Package 1 ¨C terminal upgrading works
- 3 passenger boarding bridges
- renovation to gate holding lounge
- Ramp facilities ( AGL, GPU, PCA )
- Upper deck Passengers boarding bridges for A380
Package 2 ¨C Upgrading works at the related airside facilities to fully comply with ICAO Code 4F
- shoulders for both runways and taxiways
- overlays on runways and taxiways
- relocation of AGL cabling and lamp
- new drainage system
- new pavement marking
EEC is provided ¡®Owner¡¯s Engineer professional services for the following stages of work
- project inception
- design development : this is to be prepared in sufficient detail for Tenderers to produce the necessary designs under this tender and build contract.
- award and contract documentation
- construction and commissioning
- post construction services
|
SENAI AIRPORT
|
RM 200 million
USD$ 58 million
|
Senai Airport
Sdn. Bhd.
|
Johor, Malaysia
|
2006
-
2009
|
Detailed design of landside infrastructure development.
Scope of works include planning and detailed engineering design
- Airside Infrastructure Development
- Landside Infrastructure Development
- Logistic Park / FTZ Infrastructure Development /Aviation Port
Work Scope Includes :
- Masterplanning
- Detailed design
- Tender, award
- Construction supervision
|